All toolsCalculatorsElectricalBattery Storage (BESS) Sizing & Payback
Battery Storage (BESS) Sizing & Payback
Size domestic battery storage against a solar PV array: self-consumption uplift, annual import avoided, export forgone and simple payback.
Array
Σ of module STC ratings (MCS MIS 3002)
Pre-loss yield — PR is applied below
IEC 61724-1 system losses
Demand & baseline self-consumption
Total property electricity use (MGD 003 'Annual Electricity Consumption')
Share used on-site WITHOUT a battery. UK no-battery ≈ 0.30
Battery
Capacity available for self-consumption (MGD 003 §4.5)
MGD 003 scope floor 80% (BS EN IEC 62933-2); typical Li-ion ≈ 90%
No clean public uplift curve — user-set. Default 0.65 is grounded in one MGD 003 datapoint, not a formula (see docs)
Tariffs, carbon & cost
Ofgem cap Jul–Sep 2026 ≈ 0.2611
Smart Export Guarantee — supplier-set; default illustrative
DESNZ/Defra 2026 'electricity generated' ≈ 0.13096
Market-set; 2026 UK typical £3,500–£10,500 installed