Resource Loading
Two-way labour calculator: operatives required for a target duration, or duration achievable with the operatives you have.
The Ensign ToolboxResource LoadingTwo-way labour calculator: operatives required for a target duration, or duration achievable with the operatives you have.
Task
hrs
Productive hours needed for the task
%
85 % typical — accounts for breaks, access, coordination
Working pattern
d/wk
h/d
h/wk
Target
weeks
Enter total work hours to calculate